Introduction
After renovating the new entry in the fifth article of this series, it was time to tackle the complete kitchen renovation. This major step in the renovation project involved a total transformation of the space: complete demolition, wall reconstruction, electrical and plumbing network installation, tiling, cabinet and appliance installation, and finally the finishing touches with the backsplash and decorative elements.
This kitchen renovation was essential to create a functional, modern, and aesthetic space that would become the heart of the house. The project required many technical steps and meticulous planning for each element, from the networks to the final finishes.
Initial State
The kitchen still retained its original 1970s finishes. The walls were partially covered with small green mosaic tiles, and the paint was peeling in places, revealing the underlying structure. The floor was raw concrete, and the entire space needed a complete renovation.
This initial demolition freed up the space and prepared the area for all the upcoming reconstruction work.


Floor Preparation
The floor needed significant preparation before installing the new covering. I started by completely removing the old tiles, then removed the old plumbing. A breach that split the floor in two, corresponding to the wall of the cellar underneath, was sealed with metal and cement to ensure structural integrity.


Framing, Insulation and Drywall
To create a solid and insulated structure, I started with the ceiling installation. Since the ceiling is a hollow-core slab, I installed the rail structure for the drywall with hangers directly into the hollow cores of the slab, creating a space filled with thermal insulation. The ceiling was completed first, before proceeding with the walls.
Then, I installed a metal framework with studs and rails for the walls, filled with thermal insulation for excellent energy performance. OSB panels were used in the lower part of the walls, under the window, to strengthen the structure and allow future attachment of kitchen cabinets.
For the walls, I used moisture-resistant drywall panels, specifically designed to resist moisture. The panels were fixed to the framework, then the joints were filled with joint compound and joint tape. Several layers of compound were applied before final sanding to obtain a perfectly smooth surface.



Window Installation
A new window was installed to replace the old one. This modern sliding window brings a lot of natural light into the kitchen and offers a view of the garden.
The window was positioned to optimize natural lighting and create a pleasant space for cooking.


Electrical Installation
The electrical installation was planned precisely for each appliance. Each point was marked and labeled with its exact height:
- Range hood at 1.30m height
- Oven at 0.95m height
- Microwave at 1.20m height
- Cooktop at 0.30m height
- Refrigerator at 0.30m height
Electrical conduits were installed in the framework, with junction boxes at the planned locations.


Plumbing Installation
The plumbing was installed with multilayer pipes, a modern and reliable system.
This anticipatory installation prepares the water supply for the sink and other water points needed in the kitchen.

Wall Painting
The walls were painted white to create a bright and modern space. I chose to paint the wall above the upper cabinets in dark blue (teal), creating a colored accent that adds personality to the kitchen. This touch of color elegantly contrasts with the white of the cabinets and backsplash.


Floor Tiling
For the floor, I chose large light grey tiles that add a modern touch to the kitchen. The installation was done with a professional leveling system using black clips and purple and white wedges. This system guarantees a perfectly flat surface and regular joints.
The joints were made in dark grey to create an elegant contrast with the tiles.



Cabinet, Countertop and Appliance Installation
The kitchen cabinets were installed following an L-shaped plan, with a tall column to house the oven and microwave. The light wood-look laminate countertop was installed following the L-shape, with cutouts for the sink and cooktop.
The appliances were then installed.



Backsplash Installation
The backsplash was made with large white rectangular marble-effect tiles.


Exterior Elements
To complete the renovation, the old roller shutter was removed to make way for a new insulated glass door.

Final Result
The complete kitchen renovation is now finished. The result is a functional, modern, and aesthetic space that combines elegance and practicality. The dark blue accent wall adds a touch of personality, while the marble backsplash and white cabinets create a clean and contemporary design.
All appliances are in place and functional, the networks are properly installed, and the space is ready for daily use. This renovation completely transformed the kitchen, making it a pleasant and modern space that perfectly meets our expectations.


Conclusion
The complete kitchen renovation is now finished. This major step in the project required many technical skills and meticulous planning, from the initial demolition to the final finishes. The result is a modern, functional, and aesthetic space that perfectly meets our needs.
This project allowed me to learn a great deal about complete kitchen renovation, from network management to cabinet and appliance installation.